Manufacturer · Qingdao, China · EXW / FOB Qingdao
Turnkey Lines

Yogurt Production Line

Set, stirred and drinking yogurt share the first half of the process and diverge after fermentation starts. The type you make decides the tank arrangement and what comes downstream, so we start every yogurt quotation by asking which ones you produce — or plan to.

Temperature control during fermentation does most of the work. A tank that holds temperature evenly gives consistent batches; one that does not gives problems that are hard to trace.

Fermentation and mixing tanks on skid

Process flow

Manufactured by us Specified & integrated

  1. 1
    Mixing and standardising

    Milk, powder, sugar and stabilisers made up in jacketed tanks.

    Dairy Mixing Tanks
  2. 2
    Homogenisation

    Specified and integrated; stated as bought-in.

  3. 3
    Base heat treatment

    Plate or tubular depending on viscosity once stabilisers and sugar are added.

    Milk Pasteurization Equipment
  4. 4
    Fermentation

    Insulated, temperature-controlled tanks sized to batch volume and cycle time.

    Yogurt Fermentation Tanks
  5. 5
    Cooling and breaking (stirred / drinking)

    Coagulum is broken and cooled before filling.

  6. 6
    Filling

    Cup or bottle fillers integrated to your format. For set yogurt, filling happens before fermentation.

  7. 7
    CIP

    Sized to the circuits and cleaning window.

    CIP Cleaning Systems
Real photos · our workshop

From our workshop

  • Fermentation tank with control panel
  • Polished interior and agitator

From enquiry to commissioning

  1. You send your requirements

    Raw material, target product, capacity, local voltage and frequency, heating source and destination port. If you are not sure about some of these, tell us what you do know.

  2. We send a process proposal

    A process flow, an equipment list with specifications, a suggested layout and a quotation. If more than one configuration makes sense, we explain the trade-off instead of sending one option.

  3. We manufacture and test

    Fabrication, welding, polishing and assembly in our own workshop. Standard machines ship in 20 days; a complete line in 40–45 days.

  4. Installation and training

    Our engineers travel to site — typically 4 days for installation, commissioning and operator training. Travel and accommodation are covered by the buyer.

Questions buyers ask

Can I start with stirred yogurt and add set yogurt later?
Yes, if the line is planned for it. Set yogurt needs filling before fermentation and an incubation room or tunnel, so space and utilities for that should be reserved at the start even if the equipment comes later.

Tell us about your process

About three minutes. An engineer reads every request and replies with questions or a process proposal — not an automatic price list.

Step 1 of 3

Your process

Product line *
Scope
Start with your numbers

Tell us what you produce. We will size the line.

Product, daily volume, voltage and heating source are enough to start. An engineer replies with a process flow, equipment list and quotation.