Cheese equipment is defined by the cheese. Fresh soft cheese, pasta filata and hard pressed cheese need different cutting, stirring, draining and pressing — so we design the line from the cheeses you make, not from a standard vat size.

Where the whole process is being built at once, we balance the stages against each other so vats, curd handling and pressing run at the same rhythm.

Open cheese vats

Process flow

Manufactured by us Specified & integrated

  1. 1
    Milk reception and storage

    Insulated tanks sized to delivery pattern.

    Milk Cooling & Storage Tanks
  2. 2
    Milk heat treatment

    Pasteurisation of cheese milk where your recipe and regulation require it.

    Milk Pasteurization Equipment
  3. 3
    Cheese vats

    Cutting and stirring designed for your cheese types.

    Cheese Processing Equipment
  4. 4
    Curd handling and pressing

    Draining, moulding and pressing balanced to vat output.

    Cheese Processing Equipment
  5. 5
    CIP

    Sized to the circuits and cleaning window.

    CIP Cleaning Systems
Real photos · our workshop

From our workshop

  • Cheese vat with whey drainage trolley
  • Mozzarella stretching machine
  • Twin stretching augers
  • Curd cutting harps
  • Curd draining trolley

From enquiry to commissioning

  1. You send your requirements

    Raw material, target product, capacity, local voltage and frequency, heating source and destination port. If you are not sure about some of these, tell us what you do know.

  2. We send a process proposal

    A process flow, an equipment list with specifications, a suggested layout and a quotation. If more than one configuration makes sense, we explain the trade-off instead of sending one option.

  3. We manufacture and test

    Fabrication, welding, polishing and assembly in our own workshop. Standard machines ship in 20 days; a complete line in 40–45 days.

  4. Installation and training

    Our engineers travel to site — typically 4 days for installation, commissioning and operator training. Travel and accommodation are covered by the buyer.

Questions buyers ask

Can one vat make several cheese types?
Often, within a family of similar cheeses. A vat designed for fresh cheese will struggle with a hard pressed cheese, and the reverse wastes investment. Tell us every cheese you plan to make and we will say where one vat can serve several.

Tell us about your process

About three minutes. An engineer reads every request and replies with questions or a process proposal — not an automatic price list.

Step 1 of 3

Your process

Product line *
Scope
Start with your numbers

Tell us what you produce. We will size the line.

Product, daily volume, voltage and heating source are enough to start. An engineer replies with a process flow, equipment list and quotation.